Exciting news! The plumber finally made it out this past Saturday, which meant we were able to get the cabinets in place. Behind the cabinets will be tile (which is still something we're still brainstorming about). To the right of the small nine-inch cabinet will be a stove range, and then some built-in shelves, followed by the fridge. Those pieces may not be in for a little while, but it's cool to feel the spacing of the place. We also installed the real ladder and section wall, as you can see here; the steps toward to bottom make their way to the back of the wall, which will hopefully be a little extra room for the occasional cookbook (: Every inch counts!!
I have been hesitant to post pictures because my sister will be coming home soon (6 days!!). I told her I wasn't sending any pictures of progress because I wanted it to be a complete surprise when she came. She may see this, but I really want you all to see what's been happening too! I'll make sure so get some pictures when she's here of us all working; she has some interior design goodies with her -- cushion prints, art pieces, knobs, all that good stuff!
2 Comments
So happy to be able to say that the large loft is almost complete! The sky lights are in, the windows trimmed, the interior walls finished... All that's left is to stain the floor and add in plugs! I had an cool time-lapse video that I wanted to post, but unfortunately, I would have to pay for it to be on here (I did trick the system slightly and added the file to the video, so if you really want to watch it, you can download it below!). Next week we plan on setting the cabinets for the kitchen, and hopefully finish the interior walls in the bathroom once the plumbing is complete!
|
|